FORM FOR COMMENTS ON IAPMO USEHC/USPSHTC COMMITTEE DOCUMENTS - 2012
All comments must be received by 5:00 PM PST on June 20, 2014
Cookies must be enabled to submit this form

Submitter Information
Submitter Full Name:  
Street Address:  
City:  
State:  
Zip:  
Organization:  
Organization Represented (if any):
Email Address:    
Telephone:  

Recommendation
Check one (see instructions):
Accept as Submitted
Accept as Modified
Reject

Section number:
Code:  

Please click Continue after entering your information above.


INSTRUCTIONS FOR SUBMITTING COMMENTS

 

Comment on Proposal Item number:

Proposed Text [Note: Proposed text must be in legislative format i.e., use underscore to denote wording to be inserted (wording) and strike-through to denote wording to be deleted (wording)].


Statement of Problem and Substantiation/Resolution:

Are you referencing new standards in your comment? Please provide two hard copies or one electronic copy with your comment if you are requesting a new standard be added to the code. Please note that if a standard is referenced as previously stated you must submit such standard in order for your comment to be processed. If the standard is not received by the closing date, your comment is considered incomplete and will not be processed.

Reference Standard(s) being sent to IAPMO: Upload Standard


Where additional supplementary materials such as tests, research papers or other documents need to be submitted, please provide supporting material electronically. Insert supporting material in the box below. Please note that if supporting material is not received by the closing date, it will not be accepted for review by the Technical Committee.

Supporting material being sent to IAPMO (Optional): Upload Material


Copyright Assignment (This proposal is original material and is considered to be the submitter’s own idea based on, or as a result of, research and experience, and is not copied from another source).

 
I hereby irrevocably grant and assign to IAPMO all and full rights in copyright, in this proposal. I understand and intend that I acquire no rights, including rights as a joint author, in any publication of IAPMO in which this proposal in this or another similar or analogous form is used. I hereby warrant that I am the author of this comment and that I have full power and authority to enter into this copyright assignment.
By checking this box I affirm that I am, and agree to be legally bound by the above Copyright Assignment and the terms and conditions contained therein. I understand and intend that, by checking this box, I am creating an electronic signature that will, upon my submission of this form, have the same legal force and effect as a handwritten signature.

Note: If you are not the author of this comment (this text is copied from another source) please do not submit. The author of the comment must give copyright assignment (which is the submitter’s own idea based on or as a result of research, experience and is not copied from another source).

 

(You may experience a delay after clicking this button, but please click only once.)

 

INSTRUCTIONS FOR SUBMITTING COMMENTS

PLEASE READ CAREFULLY

 

  1. Check the appropriate box to indicate whether this comment recommends adding new text, revising existing text, or delete text without substitution (see examples below).
  2. Enter the appropriate comment on proposal item number that the proposed text applies to.
  3. In the space identified as “Proposed Text” indicate as follows:
    • Where making a recommendation to “Accept as Submitted”, simply state “I request to accept the code change proposal as submitted by this public comment”.
    • Where making a recommendation of “Accept as Modified”, indicate the exact wording you propose based on the original proposal. (Refer to Examples for applying charging statement for adding text, deleting text and revising text)
    • Where making a recommendation of “Reject”, simply state “I request to reject the code change proposal by this public comment.
  4. In the space titled, “Statement of Problem and Substantiation/Resolution,” state the problem that will be resolved by your recommendation and give the specific reason for your comment.
  5. Where referencing a standard in your comment, such standard needs to be submitted in accordance with the Guidelines for Referencing Mandatory Standards. Please provide two hard copies or one electronic copy with your comment. Please note that if the standard is not received by the closing date, your comment is considered incomplete and will not be processed.
  6. Where additional supplementary materials such as tests, research papers, or other documents, need to be submitted, please provide supporting material electronically. Please note that if supporting material is not received by the closing date, it will not be accepted for review by the Technical Committee.
  7. Check the box for copyright assignment. Please note if you are not the author of this comment (this text is copied from another source) please do not submit the proposed change. The author of the comment must give copyright assignment (which is the submitter’s own idea based on or as a result of research, experience and is not copied from another source).

Note: Note: Content of Comments shall be in accordance with Section 4-4.5 of the IAPMO Regulations Governing Committee Projects of the UPC and UMC. Failure to comply with the above requirements will result in the comment not being processed. For further information on the standards process, please contact Code Development at 909-472-4110. For technical assistance, please call 909-230-5535 or 909-472-4111, or email alma.ramos@iapmo.org.

Please support IAPMO’s green initiative to remain paper free by providing the Proposed Monographs, Report on Proposals and Report on Comments in digital Adobe PDF. Note printed copies of the above referenced documents will not be available at the hearings. All requested printed copies will be mailed 30 days prior to the hearing date. In order to receive a printed copy, please submit your request by the due date on the form. http://www.iapmo.org/Pages/RequestFormforROPROC.aspx

Examples for applying charging statement for adding text, deleting text and revising text

Add new text as follows (applies only when adding a new section or all new text):
Water Service. Piping from the water main or source of water supply to the water distribution piping of the building or premises served irrespective of the water meter location.

Revise text as follows (applies when revising an existing section by deleting text, adding text or both as follows):
Building Supply. The pipe carrying potable water from the water meter or other source of water supply to the building or other point of use or distribution on the lot. Building supply shall also mean water service.Piping from the water main or source of water supply to the water distribution piping of the building or premises served irrespective of the water meter location.

Delete text without substitution (applies when deleting an entire section, table or both as follows):
302.0 Iron Pipe Size (IPS) Pipe. Iron, steel, brass and copper pipe shall be standard weight iron pipe size (IPS) pipe.
306.1 It shall be unlawful for any person to deposit, by any means whatsoever, into any plumbing fixture, floor drain, interceptor, sump, receptor, or device, which is connected to any drainage system, public sewer, private sewer, septic tank, or cesspool, any ashes; cinders; solids; rags; inflammable, poisonous, or explosive liquids or gas; oils; grease; or any other thing whatsoever that would, or could, cause damage to the drainage system or public sewer.